Customer Maximo 9 Configuration on Fusion HCI

July 31, 2025

IT leaders often ask us: “What does a real IBM Maximo deployment on Fusion HCI actually look like?”

Now you can see for yourself.

The challenge was to support five distinct Maximo 9 clusters: Development, Test, Training, User, and Production, without the cost and complexity of five separate systems.

This brief is the technical blueprint showing exactly how it was done.

Download the brief to see the real-world configuration, including:

  • The exact 6-node IBM Fusion HCI system architecture used.
  • How Hosted Control Planes (HCP) consolidated management overhead.
  • The centralized storage design that serves all five Maximo clusters.
  • Final resource calculations for CPU, memory, and storage.

Get the practical, proven blueprint for your Maximo deployment.