Customer Maximo 9 Configuration on Fusion HCI
July 31, 2025
IT leaders often ask us: “What does a real IBM Maximo deployment on Fusion HCI actually look like?”
Now you can see for yourself.
The challenge was to support five distinct Maximo 9 clusters: Development, Test, Training, User, and Production, without the cost and complexity of five separate systems.
This brief is the technical blueprint showing exactly how it was done.
Download the brief to see the real-world configuration, including:
- The exact 6-node IBM Fusion HCI system architecture used.
- How Hosted Control Planes (HCP) consolidated management overhead.
- The centralized storage design that serves all five Maximo clusters.
- Final resource calculations for CPU, memory, and storage.
Get the practical, proven blueprint for your Maximo deployment.
